Wednesday, September 28, 2011

The Carport


Framing's too exciting to take a break for the finished roof, so we just kept framing.  We finally (almost) finished up the concrete work, pouring a terrace below the library, the carport slab, the breezeway between the house and carport, and the back porch.  You can now begin to make out the carport taking shape on the left.



























Here's the view from the house, looking back toward the carport, and the root cellar underneath.  The stair up to the carport will be on the right side, against the taller concrete block wall.  The block wall on the left will be a low seating wall. 







































This is our view from the carport itself, looking back toward the house.  We'll back-fill to bring grade up to the level of the carport after we strip the forms.  You can't help but notice the maze of scaffolding we had to set up to frame this roof.  Keep in mind that on the other side of the carport slab, there's a 9' drop to the breezeway slab, so the ridge is 26' above concrete at that point.



























Here's how things are looking from the north...  That's the small back porch slab we poured, outside the kitchen.  At the ridge of the carport is a 50' x 14" LVL ridge beam that we placed by hand, as with every other stick of wood in this house.  It was nerve-wracking, but honestly not as difficult as I expected when the day finally came.  The two lower beams are 4x12 fir, spanning 28' until we get our columns in place.  Stay tuned...



























I like this shot through the trees as you pull into the carport.  You can really get a sense of how close we are on some of the clearances.  It was threading a needle to place this house on the site without losing the trees that made it so special to us.


Interior Framing

These photos are mostly just interesting to me.  It will all be covered, of course, by our finished ceiling, but in the meantime, I can enjoy it.  This is the main intersection, where the two ridges and the four valleys come together.  The ridges are narrower - single 14" LVL's, and the valleys are thicker - double 14" LVL's, as they carry a greater load.  I love to see the skeleton of a house, before it's all muddied over with insulation and finishes.  So here it is:


























And from the first floor...








































The view toward the north gable, with collar ties in place







































Looking north again, but from further back this time, to see the complete form of the roof.































One more, looking toward the carport and the breezeway...








































And finally, looking south this time.

The House Takes Shape

Here's the view from the place where people will park.  That's the guest bedroom looming over the entry porch and the library.  Beyond, with bare studs, is our bedroom over the screened porch / living room.  One of our finest hickory trees is in the foreground.  From the early planning / siting stages, we worried about getting too close to this tree, but it gives me faith in the survey that the 4' roof overhang wound up 2 feet away.  And yes, it's a 4' overhang ALL the way around.  Our current tiny cabin has almost no overhang at all, and the rain just runs down the siding.




























This is the view from the garden.  The master bedroom is on the second floor, with the screened porch / living room below.  I say that because the walls of the living room will slide (almost) completely open 6 months of the year to become a screened porch.  We're not installing air-conditioning, so the cool night air will cool our house.  Our future pond will be between the garden and the house from this view, so we'll be able to fish from the living room.  How's that for fresh?  The kitchen is to the right, with the narrow band of windows.




























We still haven't framed the carport, but the slab is ready to pour.  That's a tight grid of rebar over metal decking, which is supported by 5 steel beams below.  You can see the toe-boards on the roof, and that's really all they are - just enough to catch a toe and hold you on the roof.  There's a 2x10 walk board at the bottom, so hopefully that would break your slide before you hit the ground.  I'm not a hold-the-ladder architect -- I've spent as much time on this roof as anyone.  The first day was a bit shaky, but I'm getting my roof legs.




























Here's the back side of the house, with my son's room upstairs and our back porch below.  The small windows on the lower level are in the half bathroom and mudroom.  Those horizontal boards on the gable are just temporary collar-ties, to keep the roof from 'squalling', as my builder buddies would say.  They'll be replaced by 3/4" steel rods, which will do the same thing, but not be so obtrusive.




























And this is the front door!  Or at least the front opening.  Here's where all the odd geometry comes together.  That's the guest bedroom upstairs on the right, our bedroom in the distance straight ahead and my son's bedroom upstairs on the left.  Downstairs, it's the library on the right, 32" below the main slab, the living room straight ahead and the kitchen to the left.  I was sitting in the basement below the carport as I took this photo. Now to further complicate the matter, all the walls covered with plywood will receive slate siding.  All the open stud walls will receive clear, insulated polycarbonate, inside and out, so they'll be translucent.  Think of it as a clear north-south gable form, intersecting an opaque northeast-southwest gable form.  That's the organizing principle of this design.

Got it?


























Forgot to mention, that's just plastic and wire mesh on the ground, getting ready for the breezeway slab between the house and the carport.

Monday, September 12, 2011

FRAMING

I love framing!  Over the course of a month or so, the house goes from a flat slab to its finished form.  I've got lots of pictures, but it seems like you can never get enough.  By the end of the week, the whole project has changed.  This is a broad view from the garden, with most of the first floor walls stood up and most of the plywood sheathing in place.  We're going to use slate siding (yes, on the walls) that was removed from the roof of a nearby church, so we've used beefy 5/8" plywood for all the sheathing.


























Now the second floor is even beginning to take shape.  This is a view from the main entry, looking out across the creek to the garden.  On the right is the sunken living room.


























And here's a view from the carport, with a now relatively dry basement underneath.  You're looking at the metal decking, before the concrete slab is poured on top.


























We're going for a vintage industrial look with these timber connections, with lots of exposed steel brackets and bolts.  These are 6x12 fir beams, framing into an 8x12 girder.



































This is a blowup of our custom steel brackets.  It's essentially a 'T' section, welded from 1/2" steel plate.  The bracket is first bolted to the girder, and then the slotted beam slides (or gets beaten) into place and is bolted tight.  We do most of our own welding on-site, but these brackets had to be built by a certified shop.  Those are 6  5/8" grade 8 bolts making the connection, by the way, and 6 more bolt through the girder.


































Here's a more general view, from the corner of our water room, looking back toward the kitchen.


























We really weren't excited about any of the off-the-shelf hardware that we could find for heavy timber brackets, so we made these post bases ourselves.  These get covered by a brick coping, so they're welded stainless steel.  Each post sits on 4 vertical angles which makes a cruciform stand that's slotted into the cedar post.  Here we've used 5/8" stainless steel bolts to secure the post to the base to prevent staining the cedar.


























And at the top of the post, it's another steel bracket, this time holding the posts to the LVL's above.

Flat-work

After a long delay, we've finally poured the slabs.  Another 20+ yards of concrete, this time thankfully less stressful than pouring the walls.  An observant reader might notice that the time frame of my posting does not necessarily correspond to the time frame of the work on the house.  I'll try to keep it in chronological order at least.  The shot below is from the garden across the creek.  The wood supports you see were to keep the edge of the slab vertical where it overhangs the poured concrete wall below.  The carport / basement is in the background.


























Here you can see, in the foreground, the sunken living room and, in the background, the main slab.  We've got 2" of rigid foam beneath the slab, and a 15 mil vapor barrier to keep any ground moisture from rising up into the concrete.  This is just a rough slab, for construction, and will ultimately be covered by a 2 1/2" topping slab full of radiant floor piping.


























And the view from the carport.  This is the southwest to northeast axis, intersecting the north - south axis of the main house.  Under the carport will be our only real basement area, and it will serve as our staging area for construction.  We'll use 5 steel beams to span the basement walls, with metal deck and a concrete slab on top to create the floor of the carport.  You can also make out the vertical waterproofing on the outside of the block walls below grade.  We first parged the block, then gave it a thick coat of 'Black Mammie' as it's known around here, and finally stuck black plastic in the still-wet bituminous waterproofing.  It was messy, but should be a good barrier against ground moisture.